Building design & construction phases
MEP/HVAC Project Process from Inception to Completion
An overview of the MEP/HVAC project process:
*Inception Phase*
1. *Project Definition*: Define project scope, objectives, and requirements.
2. *Feasibility Studies*: Conduct studies to determine the viability of the project.
*Design Phase*
1. *Schematic Design*: Develop initial MEP/HVAC design concepts.
2. *Design Development*: Refine the design, considering factors like energy efficiency and sustainability.
3. *Construction Documents*: Create detailed drawings and specifications for construction.
*Procurement Phase*
1. *Tendering*: Invite bids from contractors and suppliers.
2. *Contract Award*: Award contracts to selected contractors and suppliers.
*Construction Phase*
1. *Installation*: Install MEP/HVAC systems, including ductwork, piping, and equipment.
2. *Site Supervision*: Monitor progress, ensure compliance with specifications, and address issues.
*Testing and Commissioning Phase*
1. *Testing*: Verify that MEP/HVAC systems meet design specifications and function as intended.
2. *Commissioning*: Ensure systems are properly integrated and functioning correctly.
*Completion Phase*
1. *Final Inspections*: Conduct final inspections to ensure systems meet requirements.
2. *Handover*: Hand over completed MEP/HVAC systems to the building owner/occupier.
3. *Documentation*: Provide operation and maintenance manuals, and training on system use and maintenance.
*Post-Completion Phase*
1. *Warranty and Support*: Provide warranty and support services.
2. *Performance Monitoring*: Monitor system performance and identify opportunities for improvement.
This process ensures that MEP/HVAC systems are designed, installed, and operated to meet the needs of building occupants while minimizing energy consumption and environmental impact.